For the purpose of ______ tank or hold washings from any vessel,an application shall be made to Harbor Authorities for approval.
A. Discharging
B. Recircling
C. Loading
D. Taking in
查看答案
In all cases,however,the capacity of segregated ballast tanks shall be ______ such that,in
At least
B. At most
C. So big as
D. As large as
Existing crude oil tankers may,______ being provided with segregated ballast tanks or operating with a cargo tank cleaning procedure using crude oil washing,operate with dedicated clean ballast tanks in accordance with the specified provision of the Regulation.
As per
B. In the consequence of
C. In accordance with
D. In lieu of
Gasoline fuel tank vents should terminate ______.
A. In the engine compartment
B. In the fuel tank space
C. Above or outside the hull
D. At the most convenient location
Every new crude oil tanker of 20 000 tons deadweight and above shall be fitted with a cargo tank cleaning system using ______.
A. Hot water
B. Cold water
Chemicals
D. Crude oil washing