题目内容

Process-based structures stress vertical rather than lateral relationships among various parts of the organization.

A. 对
B. 错

查看答案
更多问题

Network-based structures are most suitable for multinational corporations which have to coordinate the diverse, complex and dynamic relationships among multiple subsidiaries.

A. 对
B. 错

An important consequence of downsizing has been the fall of the contingent work force.

A. 对
B. 错

Reengineering means the fundamental rethinking and radical redesign of business process to achieve improvement in performance.

A. 对
B. 错

伤者背部多处砍创清创缝合后,长度累计达到114cm,但伤者无失血性休克或肢体功能障碍发生,其可能的损伤评定为

A. 轻伤
B. 重伤
C. 轻微伤
D. 无法判断

答案查题题库