题目内容

Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the(2)and must develop enough knowledge about the(3)and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4)for process and data of current system, the deliverable from this phase also includes the(5)for the proposed system.

A. hardware and software specification
B. system performance specification
C. formal requirements definition
D. general problem statement

查看答案
更多问题

Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the(2)and must develop enough knowledge about the(3)and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4)for process and data of current system, the deliverable from this phase also includes the(5)for the proposed system.

A. logical models
B. physical models
C. design models
D. implementation models

“京味话剧”

国产TS8350制动鼓镗床镗削直径范围为()

A. 220-450
B. 200-400
C. 220-500
D. 210-480

膜片式汽油泵供油压力过高的原因是()

A. 油道有堵塞物
B. 泵膜弹簧过软
C. 摇臂无自由行程
D. 泵麽弹簧过硬行程太长

答案查题题库