词汇与结构One method is to dive the airplane (in smooth air only) to VNE speed (red line on the airspeed indicator) and (within the limits of safety) execute a rapid_________.
A. pull down
B. pull up
C. pull off
D. pull on
查看答案
词汇与结构In some cases, this may force the landing gear into the down and_________.
A. powered-on position
B. powered-off position
C. unlocked position
D. locked position
词汇与结构The pilot must _________ the design stress limits of the airplane while attempting to lower the landing gear.
A. avoid proceeding
B. avoid exceeding
C. attempt exceeding
D. attempt proceeding
词汇与结构After stabilizing at or slightly less than maneuvering speed, the pilot should alternately and aggressively apply rudder in _________ and then the other in rapid sequence.
A. backward direction
B. negative direction
C. forward direction
D. one direction
词汇与结构If all efforts to extend the landing gear have failed, and a gear up landing is inevitable, the pilot should select an airport with ________ facilities.
A. crash and rescue
B. crash and escape
C. escape and rescue
D. rescue and medical