题目内容

ICT业务收入确认必须经过哪些部门审核()

A. 系统集成中心
B. 财务部
C. 市场部
D. 客户服务部

查看答案
更多问题

Which three MPLS statements are true?()

A. Cisco Express Forwarding (CEF) must be enabled as a prerequisite to running MPLS on a Cisco router.
B. Frame-mode MPLS inserts a 32-bit label between the Layer 3 and Layer 4 headers.
C. MPLS is designed for use with frame-based Layer 2 encapsulation protocols such as Frame Relay, but is not supported by ATM because of ATM fixed-length cells.
D. OSPF, EIGRP, IS-IS, RIP, and BGP can be used in the control plane.
E. The control plane is responsible for forwarding packets.
F. The two major components of MPLS include the control plane and the data plane.

NetMAX-TL进行邻区规划有哪些步骤()

A. 导入工程参数
B. 选择待规划邻区的小区
C. 设置邻区规划参数
D. 运行邻区规划

国际反腐败日于每一年的()。

A. 42683.0
B. 42713.0
C. 42378.0

简述幼儿园集体教学的优点和局限性。

答案查题题库