在定时/计数器的计数初值计算中,若设最大计数值为M,对于工作方式1下的M值为( )。
A. M=8192
B. M=256
C. M=16
D. M=65536
查看答案
51单片机的定时器T0用做定时方式时,采用工作方式1,初始化编程为()。
A. TMOD=0x01
B. TMOD=0x50
C. TMOD=0x10
D. TMOD=0x02
Listen to the following sentences and interpret them, paying attention to the translation of the passive voice.原文:(1)As the economies of China and the United States become increasingly interdependent, the economic and trade relationship has been regarded as a stabilizer for relations between the two countries.(2)The New World Plaza is scheduled to be completed and turned over for use by the end of this year.(3)Efforts should be made to reverse the current economic downturn and fight against protectionism in trade.
下列各项中,符合费用定义的有()。
A. 财务费用
B. 税金及附加
C. 生产成本
D. 营业外支出
下列各项中,应列入利润表“营业成本”科目的有()。
A. 以短期租赁方式出租设备计提的折旧额
B. 出租非专利技术计提的摊销额
C. 出售商品的成本
D. 对外提供劳务的成本