题目内容

According to Monica, which inspection is of great importance?

A. First Piece Inspection
B. Receiving Inpsection
C. Final Inspection
D. Sampling Inspection

查看答案
更多问题

How often will they carry out the sampling inspections?

A. Twice a week
B. At set intervals
C. At random
D. Every day

When is the Final Inspection usually carried out?

A. Before the lathes are ready fro packaging.
B. After the lathe are transported to the customers.
C. Before the lathes are installed are installed for a testing.
D. When the material and the parts from the suppliers arrive.

What does Monica remind Michael to do at last?

A. To send her the inspection scheme.
B. To check the misssing parts of the lathes
C. To study the designing specifications.
D. To keep records of the inspections.

在美国,一般情况下生存期预期小于等于( )个月的患者可以获得安宁疗护资格

A. 3
B. 6
C. 9
D. 12

答案查题题库