Bottom blow valves are installed on auxiliary water-tube boilers to ()
A. remove suspended and precipitated solids from the boiler water
B. completely drain the boiler in an emergency situation
C. prevent hardened scale deposits in the water drum
D. remove floating impurities from the oily water surface
长距离整治水平时,后整治的一侧钢轨的抬高要比先整治的一侧钢轨稍高()mm。
A. 1—2
B. 2—3
C. 3—4
D. 4—5
抗震设计的两阶段设计分别为:第一阶段为结构设计阶段,第二阶段为验算阶段。
A. 正确
B. 错误
CCC控制器AUX窗口显示:“Shutdown”表示什么?