A customer currently has five partitioned POWER4 systems and is adding new systems. When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()
A. Order a new HMC to support the p5 system.
B. Attach the new p5 system to the existing HM
C. Upgrade the existing HMC to accommodate both the POWER4 and p5 systems.
Do nothing. This system does not require an HM