A. Due weather B. Due landing delay at destination C. Due separation Due flow control
A. Due traffic B. Due weight C. Due performance Due weather
A. 40 minutes B. 11 minutes C. 8 minutes D. 25 minutes
At 51. B. At 42 C. At 25 D. At 50.
A. Due separation B. Due flow control C. Due traffic Due weather