题目内容

Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the (2) and must develop enough knowledge about the (3)and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4)for process and data of current system, the deliverable from this phase also includes the(5)for the proposed system.空白(5)处填()

A. hardware and software specification
B. system performance specification
C. formal requirements definition
D. generalproblemstatement

查看答案
更多问题

当现浇板的受力钢筋与梁平行时沿梁长度方向应配置间距不大于200mm且与梁相垂直的构造钢筋,其直径不应小于()

A. 6mm
B. 8mm
C. 10mm
D. 12mm

大龄协保就业补贴,本月申领,何时享受?()

A. 当月享受
B. 次月享受

对某退火碳素钢进行金相分析,其组织的相组成物为铁素体+渗碳体(粒状),其中渗碳体占18%,问此碳钢的含碳量大约是多少?

APU运转,APU引气系统工作,则松出APU主电门()

APU在完成一个冷却循环后停车;
B. APU立即停;
C. APU在低压和高压燃油关断活门关时停。

答案查题题库