GPON的T-CONT分为5种业务类型,不同类型的T-CONT具有不同的带宽分配方式,可以满足不同业务流对时延、抖动、丢包率等不同的QoS要求。T-CONT类型2的特点是()
A. 保证带宽(Assure分配,适合对抖动要求不高的固定带宽业务
B. 固定带宽(Fixe分配,适合对时延敏感的业务
C. 非保证带宽(Non-Assure分配,适合于有服务保证要求而又突发流量较大的业务
D. 尽力而为(BestEffort),无带宽保证,适合于时延和抖动要求不高的业务
化学需氧量测定方法有()及()两种,不同的方法测定结果不同,一般地说,()COD>()COD,故其结果必须注明测定方法。
Your network contains an Active Directory domain named contoso.com. The network is configured to use ISATAP.You have a server named Server1 that runs Windows Server 2008 R2.On Server1, you discover that a tunnel adapter named isatap.contoso.com has a Media State of Media disconnected.You confirm that Server1 has a valid network connection and can query the DNS server.You need to ensure that the isatap.contoso.com tunnel adapter has an IPv6 address.What should you do?()
A. Start the IP Helper service.
B. Start the IPsec Policy Agent service.
C. Add a new rule to Windows Firewall.
D. Add an entry for ISATAP to the Hosts file.
合同签订后,因建设单位在征地环节上出了问题,施工场地延后3个月才交付给安装公司,所以建设单位将合同开工时间延后到2013年4月1日。安装公司项目部进场后,因订购的Φ200×7mm钢管无法按时到货,向建设单位申请项目工期增加30天,建设单位不同意安装公司的合同工期增加申请,并有偿提供了库存的Φ200×5mm钢管,安装公司项目部将这批管子在未经检验的情况下,直接用于工程设备安装,监理工程师发现后,拒绝对本项目验收签字。 水处理厂的设备安装工程在2014年3月11日完成后,建设单位未经工程验收及竣工结算就投入使用。水处理厂使用10天后,发现工程存在Φ200×5mm钢管变形、焊缝渗漏等严重质量问题,只能停止使用。建设单位要求安装公司维修,安装公司要求先进行工程竣工结算后,再进行维修。 送达施工现场的管道材料和元件应检验哪些内容?