Estimating schedule activity costs involves developing an (1) of the cost of theresources needed to complete each schedule activity. Cost estimating includes identifying and considering various costing alternatives. for example, in most application areas, additionalwork during a design phase is widely held to have the potential for reducing the cost of the execution phase and product operations. the cost estimating process considers whether the expected savings can offset the cost of the additional design work. cost estimates are generally expressed in units of (2) to facilitate comparisons both within and across projects.the (3) describes important information about project requirement that is considered during cost estimating.空白(2)处填()

A. activity
B. work
C. currency
D. time

查看答案
更多问题

塑性脂肪

在正常情况下,活塞环的磨损率应不大于()。

A. 0.1~0.3mm/kh
B. 0.3~0.5mm/kh
C. 0.5~0.7mm/kh
D. 0.7~1.0mm/kh

活塞环搭口对侧拆成两段的原因主要是()。

A. 搭口间隙过小
B. 环槽结碳
C. 环槽磨损
D. 环受冲击

目前矫正屈光不正的有效方法包括()

A. 药物
B. 理疗
C. 框架眼镜、角膜接触镜、手术
D. 框架眼镜、角膜接触镜
E. 药物、手术

答案查题题库