题目内容

Which of the conditions below have to be met in order for this to occur? (Choose all that apply).

A. The switch that will share the VLAN information must be in the VTP Server mode.
B. The switches must be in the same VTP domain.
C. The switch that will share the VLAN information must be configured as the root bridge.
D. The switches must be configured to use the same VTP version.
E. The switches must be configured to use the same STP version.
F. The switches must be configured to use the same type of ID tagging.
G. The switches must be connected over VLAN trunks.

查看答案
更多问题

For this part,you are allowed 30 minutes to write a composition on the topic College Students' Consumption.You should write at least 120 words following the outline given below in Chinese:
1.图中所示为我国某城市大学生消费结构的比例,请对此进行分析;
2.请说明产生这种现象的原因(可从大学生消费心理的变化加以说明)。
College Students' Consumption

You are the desktop administrator of your Windows 2000 Professional computer.
On your computer you have a printer named LaserJet that is attached to your local LPT1 port. You have shared LaserJet and given Print permission to the Sales group. You are a member of the Sales group. On many occasions you find that you have to wait a long time for your print jobs because there are several jobs ahead of yours. You create a second printer named LaserJet2 using LPT1 port and the default settings.
You want to ensure that you do not have to wait for other print jobs before your print jobs can complete.
What should you do? (Each correct answer presents part of the solution. Choose two)

A. Grant only your account Print permission to LaserJet2.
B. Deny Print permission to the Sales group on LaserJet2.
Configure LaserJet to Start printing after last page is spooled.
D. Configure LaserJet to Print directly to the printer.
E. Set the priority of LaserJet to 10.
F. Set the priority of LaserJet2 to 99.

听力原文:Q. When did she come home?
When did she come home?

某建筑公司承建了某综合大楼工程,并签订了工程施工总承包合同。该工程项目建筑面积 50000m2。在工程施工过程中,该建筑公司选派了一名具有丰富项目管理经验,但没有相应项目经理资质证书的老同志担任该工程项目的项目经理。根据工程的实际情况,该项目经理采用了以包代管的方案,将工程项目分包给了另一家施工企业,而该分包单位又将工程项目的建筑电气工程和给排水工程转给某安装工程公司进行施工。
问题
1.该建筑公司选派的项目经理是否合适?为什么?
2.建筑电气工程和给排水工程的分包是否合理?为什么?
3.该工程项目以包代管的管理方案是否合理?为什么?

答案查题题库