题目内容

某灌溉泵站装机功率为12000kw,装机流量为150m3/s,该站的工程规模为()。

A. 大(1)型
B. 大(2)型
C. 中型
D. 小(1)型

查看答案
更多问题

The best title for the passage might be ______.

Advertising Since the War
B. Advertising and Manufacturers
C. Advertising--England' s Biggest Industry
D. Advertising and Purchasers

水利工程保修期从工程移交证书写明的工程()日起计算。

A. 完工
B. 竣工
C. 验收
D. 使脂

In the second paragraph, the word "track" could best be replaced by which of the following

A. Band.
B. Rails.
C. Path.
D. Sequence.

The word "drowsy" in the last paragraph means ______.

A. sick
B. asleep
C. a little sleepy
D. nosy

答案查题题库