题目内容

Attn: All residential owners The general misconception is that a building permit is required only if you are building a new home or undertaking a major construction, like the addition of another story to your home. However, building permits are equally critical for domestic remodeling. Home-improvement projects that require alterations to an existing structure may also require a permit. Any person applying for a permit to construct a facility or renovate a house must submit the following to the municipal office at least two weeks before the proposed start of construction: 1. Completed application form. 2. Erosion control plan(if the project will result in disturbing the ground due to use of mechanical equipment). 3. Four copies each of the site, architectural, and structural plans of the areas affected by such work. 4. Please indicate your proposed building schedule and the name of your building contractor. Construction work begun before a permit is granted will be subjected to stoppage and outright demolition at cost to the owner. After your application is approved, your building contractor will be issued a permit, which must be posted at the work site throughout the period of construction. Inspector Lyle Barns Rockhampton City Building Inspector
What is the subject of the memo?

A. Policies on building demolition
B. Requirements for purchasing a house
C. Procedures in getting a construction permit
D. Guidelines for newcomers in the city

查看答案
更多问题

灌浆前钻孔冲洗的目的是什么?

聚合物的交联:是指聚合物在成型过程中,由体型结构交联为线形结构的化学反应过程。()

高聚物若是在一根根的分子链之间有一些短链把它们连起来,则称为线型高聚物。()

将单位吸水量ω=0.044L/min.m.m换算成透水率q的吕荣(Lu)值。

答案查题题库