项目经理要与全体团队成员共同研究确定每一成员在各个工作阶段该做什么工作、达到什么标准和质量,以及如何考核奖惩的共识与文件,这属于绩效管理及考核内容当中的()。
A. 绩效管理计划
B. 绩效沟通
C. 绩效考核与评价
D. 薪酬管理
查看答案
Which options would you consider while configuring a flash recovery area fast recovery area in 11g Release 2 for your production database that is running in ARCHIVELOG mode?()
A. Setting the FAST_START_MTTR_TARGET to set the mean time to recover
B. Setting the RECOVERY_PARALLELISM parameter to twice the number of CPUs
C. Using the DB_RECOVERY_FILE_DEST parameter to set the location for flash recovery area
D. Using the DB_RECOVERY_FILE_DEST_SIZE parameter to define the disk space limit for the recovery files created in the flash recovery area
While logged into the console, a system administrator would like to change the server’s primary IP address from X.X.X.X to Y.Y.Y.Y. What would be the best way to perform this task?()
A. Use smit chinet
B. Use smit mktcpip
C. Issue ifconfig -a Y
D. Edit the /etc/hosts file with the new IP informatio
WAP业务通过()疏导
A. 第三方出口
B. 集团出口
C. 第三方出口或者集团出口都可以
D. 以上说法都不对
代维人员考核指标有()
A. 家庭宽带装机时长
B. 装机用户数
C. 装机材料
D. 预约时长