题目内容

某厂总装机容量1200MW。2008年全年预计利用小时5800小时。该厂预计年发电量是()万千瓦时。

A. 696000
B. 69600
C. 6960
D. 696

查看答案
更多问题

Which three statements about the Cisco MPLS TE Fast Reroute (FRR) process are true?()

A. TE tunnels that are configured with the FRR option cannot be used as backup tunnels.
B. TE tunnels that are configured with the FRR option can be used as backup tunnels.
C. The backup tunnel that is used to protect a physical interface must have a valid IP address configured.
D. Interfaces must use MPLS global label allocation.
E. The source IP address of use backup tunnel and the merge point (MP) should not be reachable.

在苏丹标准目录印发前,各局可以中国国家标准或者《市场采购出口商品检验基本要求(试行)》作为判定依据。()

A. 正确
B. 错误

人类社会物质交往的产物是()。

A. 社会存在
B. 宗教
C. 哲学
D. 社会意识

联网核查是指通过联网核查公民身份信息系统核对或查询相关个人的公民身份,以验证相关个人的居民身份证所记载的姓名、公民身份证号码及照片及签发机关等信息真实性的行为。

A. 正确
B. 错误

答案查题题库