题目内容

In securing deck loads for an ocean tow,drill pipe should be().

A. galvanized to protect against corrosion
B. held in place with heavy materials such as spare pendant wire
C. limited to no more than five courses high
D. provided with bulwarks at both ends of their bay

查看答案
更多问题

农业银行的并购贷款期限一般不超过()年,总行级核心客户与行业重点客户并购贷款期限可延长至()年。

A. 3;5
B. 5;7
C. 5;6
D. 2;5

撤销仲裁裁决

会计报告编制流程是什么?

答案查题题库