题目内容

During Company.com planning session, the LVM requirements for HACMP are provided. The administrator explains that there are five volume groups in the current production environment because filesystems constantly change due to the nature of the business. Maintenance outages are limited to one Saturday per month. There is some concern about the amount of time that will be required for outages once HACMP is installed. With HACMP,what will be the simplest methods of managing LVM changes while minimizing required downtime.()

A. Make changes and allows Lazy Update to sync the changes later.
B. Use the Cluster Single Point Of Control to manage LVM changes.
C. Use exportvg on the primary node and improtvg on the second node.
D. Set up a local NFS cross-mount, and use the local filesystem until the outage.

查看答案
更多问题

某普通干货船在中国某港口进行PSC检查时,发现其货舱舱口围板至主甲板中心线为550mm.PSC官员认为该项不满足LOADLINE公约对位置1舱口围板高度应不小于600mm的要求。船东认为舱口围板高度应不小于600mm是指其量至甲板最低点的距离,而该货舱舱口围板在左右两舷距离主甲板均为600mm,已满足载重线公约的要求。你认为哪方是正确的:()

A. PSC官员
B. 船东

在PowerPoint中,自定义动画效果时()。

A. 可以设置动画效果的触发条件
B. 不能改变动画的播放速度
C. 可以为动画添加声音
D. 可以改变动画的颜色

价值工程对象选择常用的方法包括()。

A. 百分比分析法
B. 因素分析法
C. O-4法
D. 头脑风暴法
E. 价值指数法

当你填写订单时,应要填写怎样的内容?

答案查题题库