题目内容

Many of the variances in a standard costing system focus on the control of long-term variable costs.

A. 对
B. 错

查看答案
更多问题

The first batch of a new product is expected to take 5 hours to manufacture(at a labour cost of $10 per hour)and the expected material cost is $10 per batch.An 80% learning curve is expected to apply,but it is planned to establish a standard cost at the time required to produce the 40th batch of the product.When the learning curve is expressed as a formula Y=ax^b,the value of b is-0.3219281.What will be the standard variable cost per batch?

A. 12.46
B. 20.38
C. 25.24
D. 25.37

Which method of pricing is most easily applied when two or more markets for the product or service can be kept entirely separate from each other?

A. Price discrimination
B. Product line pricing
C. Skimming
D. Volume discounting

A mix of three materials into a process produces one litre of a finished product,with some loss of input in the process.Standard material costs are as follows per litre of output.Material$X0.3 litres at $2 per litre0.60Y0.6 litres at $3 per litre1.80Z0.3 litres at $1 per litre0.302.70During a control period,5,000 litres of output were produced.These used 1,400 litres of Material X;3,100 litres of Material Y;and 1,250 litres of Material Z.What is the materials yield variance?

A. $412.50(A)
B. $150(F)
C. $469(F)
D. $562.50(F)

A company produces a blended drink product from two ingredients,Ingredient A and Ingredient B.Ingredient A is more expensive per litre than Ingredient B.During the most recent period,the company produced fewer litres of finished drink product than budgeted,and it used a larger than expected proportion of Ingredient A in the materials mix than expected.Which one of the following statements is correct about materials variances in the period?

A. The materials mix variance is adverse and the materials variances is also adverse
B. The materials mix variance is adverse but the materials yield varian cannot be measured with the available data
C. The materials mix variance is favourable and the materials yield variance is also adverse
D. The materials mix variance is favourable but the materials yield variance cannot be measured with the available data

答案查题题库