An exhaust gas bypass is installed on a waste heat boiler in order to ().
A. bypass exhaust gas at high loads to prevent excessive back pressure
B. bypass a portion of the exhaust gas at peak loads for better efficiency
C. recycle exhaust gas to the turbocharger
D. minimize moisture condensation in the boiler gas passages at low load
查看答案
银行业从业人员应当做到授信尽职,对申请贷款企业的授信尽职包括什么?
滚动轴承内径超出500,用分数表示如:IE230/710CAK/C3W33外径1030,内径710,宽度236()。
A. 正确
B. 错误
按照规定,对入监罪犯的教育时间为()个月,考核不合格的,延长()个月。