Your load line certificate expires on 27 May 2006.The vessel is surveyed on that date and
A new certificate must be issued before you sail
B. The existing certificate is endorsed as valid for a five year period commencing 27 May 2006
C. The existing certificate is extended for a period of up to 150 days
D. The existing certificate is extended until the first foreign port of call where a new certificate will be issued by the local surveyor
Please arrange the ______ of my Deratting Exemption Certificate.
A. Renewal
B. Replacement
C. Recheck
D. Review
Maritime Declaration of Health is generally prepared by the Master ______.
A. when his vessel is arriving at a foreign port
B. when his vessel is leaving a foreign port
C. after his vessel has left a foreign port
D. after his vessel has arrived at a port