The end product of the _________ stage is a set of system requirements.
A. analysis
B. design
C. investigation
D. operation
查看答案
The deliverable of the system _________ phase is the set of technical system specifications.
A. analysis
B. design
C. investigation
D. programming
A _________ conversion involves shutting the old system off and turning the new system on at a certain point in time.
A. direct
B. parallel
C. phased
D. pilot
_________ conversion is the most risky.
A. Direct
B. Parallel
C. Phased
D. Pilot
A _________ conversion introduces the new system in one part of the organization.
A. direct
B. parallel
C. phased
D. pilot