题目内容

A retail customer has an 8-core Power 740 server with 2 partitions. Production has 4 dedicated cores and the test partition has 2 dedicated cores. Both partitions run during the day without problems. At night, batch processing is exceeding the run window. Which solution addresses this problem without requiring additional hardware?()

Adding VMControl will automate processor resource allocation during peak workloads
B. Enable Dynamic Symmetric Multithreading in the HMC to balance workloads across processors.
C. Add processing resources during the times they are required using Utility Capacity on Demand.
D. Changing the partitions to Uncapped can make use of additional processor cycles during peak workloads.&e

查看答案
更多问题

患儿,6个月,早产儿,出生体重2200g,母乳喂养,现体重8kg,家长发现孩子多汗、夜惊,体检患儿前囟大、方头、肋串珠。最可能的病因是()

A. 日照不足
B. 生长过速
C. 慢性腹泻
D. 药物影响
E. 母乳喂养

序列数据没有时间戳。

A. 正确
B. 错误

()二次回路不能短路。

A. 电流互感器
B. 电压互感器
C. 故障指示器
D. 带电指示器

葡萄牙立法机关实行()

答案查题题库