What serves as a list of measurable checkpoints for PM and your manager’s manager to know roughly when different parts of the project will be done?
A. Existing Solution.
B. Overview.
C. Detailed Scoping and Timeline.
D. Milestones.
查看答案
What should you do before sending your design doc to others to review?
A. Send it the Architect. ;
B. Check the structure.
C. Do the Skeptic Test.
Do the proofreading.
A design document is a description of how you plan ________.
A. to describe a problem
B. to solve a problem
C. to analyze a problem
D. to assess a problem
The purpose of the software design is usually in the section of ________.
A. Introduction
B. System Description
C. Detailed System Design
Database Description