题目内容

RESUME
John A. William
2195 Park Avenue
Monroe, LA 72102-3876
(318) 332-8471
Career Objective:
Laboratory Technician
Education:
1985—1989: University of Chicago, Chicago, III. B.Sc.,
majored in Chemistry
Scholastic Average: B plus
Minored in Mathematics, Scholastic Average: B plus
Scholarships:
1985—1987: Half-tuition scholarship
1988—1989: Full-tuition scholarship
Working Experience:
1987—1988 Laboratory Assistant, Chicago Downtown Hospital. Work involved blood, urine analyses; record-keeping. Average 10 hours per week during the school year. Worked full-time during summers of 1988 and 1989.
1988—1989 Clerical Assistant, Chemistry Department, University of Chicago.
RESUME
This is a【46】. The applicant graduated from【47】and majored in【48】. He is going to apply for【49】He worked as【50】during 1987 to 1988.

查看答案
更多问题

人力资源部是部门A还是部门B?

图1-5是PC1采用ipconfig/renew重新租用IP地址的命令窗口,在(9)处填入正确的IP地址。
图1-5表明,PCI(10)。 (10) 备选答案: A.仅分配了IPv4地址 B.仅分配了IPv6地址 C.既分配了IPv4地址,又分配了IPv6地址

The two main elements of the garden are Longevity Hill (万寿山) and Kunming Lake. The garden is divided into three parts: a political activity area; the living quarters of the empress; and a scenic area.
The buildings on the southern slope of Longevity Hill are characteristic of the garden. At the foot of Longevity Hill is the 728-meter-long passageway(长廊) which links the three areas together.
The bridges of the western causeway of Kunming Lake are replicas(复制品) of the bridges of famous Su and Bai causeways(堤道) on West Lake in Hangzhou.
Back Lake at the northern foot of Longevity Hill is natural and peaceful. On its bank is Suzhou Street, a replica of a commercial street in the old days.
The Summer Palace was opened to the public in 1924 and it takes one day to view it in detail. Public buses or special sightseeing coaches can take you there.
Summer Palace in Beijing
The location of the Summer Palace:【46】of Beijing.
The usage of the garden: for emperors'【47】.
Something linking the three areas:【48】.
The character of Back Lake:【49】.
The transportation tools to the garden: buses or【50】.

某机电安装工程公司承接了某机电设备安装任务,该机电安装工程公司为了提高工程质量,创造正常施工条件,加强了对工程施工人员、施工机具、工程材料的控制.由于该机电安装工程公司项目经理部的控制措施和方法得当,使得各项工作有条不紊地进行,按期完成该工程的施工任务。
问题
1. 在机电安装工程施工中,应从哪些方面对施工人员进行控制?
2.在机电安装工程中;应重点控制施工机具的哪些方面?
3.机电安装过程中,施工检测器具的选用原则是什么?
4.工程材料质量的检验方法有哪几种?
5.简述机电安装工程材料进货检查和验收的控制要求。

答案查题题库