题目内容
In order to link data centers, a customer is evaluating the installation of fiber optic cable between buildings that are 400 meters apart. The installation will require multiple patch panels and cables. Which of the following is the most critical factor to consider for this installation?()
查看答案
搜索结果不匹配?点我反馈