题目内容

你为领导印了一份报告,其中有两个错别字,领导当面严厉地责备了你,请问你如何面对?

查看答案
更多问题

Read this part of a letter
Dear Sir or Madam
Our Order Number 8044P
On 13 May, we ordered six packs of A4 photocopy paper and one bottle of printer's ink from you. When we received this order, we found that the bottle were broken, and that the ink from the bottle had damaged all six packs of paper.
We should be grateful if you would replace these items, or arrange to credit us with their value.
Yours faithfully
Miguel Gomez, Office Manager
&8226;Write a reply to your customer
&8226;thanking him for his letter
&8226;apologising
&8226;saying what you are going to de about his complaint
&8226;promising better service in future.
&8226;Write 60-80 words on your Answer Sheet.
&8226;Do not include postal address.

请根据给定资料9、10,分析这两个资料对搞好水电开发提供了哪些重要启示。
要求:分析简明扼要,条理清楚,不超过200字。

有以下程序:
include<iostream>
using namespace std;
class Base
{
public:
Base()
{
K=0;
}
int x;
};
class Derivedl:virtual public Base
{
public:
Derivedl()
{
x=10;
}
};
class Derived2:virtua1 public Base

背景:
某工程,建设单位委托监理单位承担施工阶段的监理任务,总承包单位按照施工合同约定选择了设备安装分包单位。在合同履行过程中发生如下事件:
事件1:工程开工前,总承包单位在编制施工组织设计时认为修改部分施工图设计可以使施工更方便、质量和安全更易保证,遂向项目监理机构提出了设计变更的要求。
事件2:专业监理工程师检查主体结构施工时,发现总承包单位在未向项目监理机构报审危险性较大的预制构件起重吊装专项方案的情况下已自行施工,且现场没有管理人员。于是,总监理工程师下达了《监理工程师通知单》。
事件3:专业监理工程师在现场巡视时,发现设备安装分包单位违章作业,有可能导致发生重大质量事故。总监理工程师口头要求总承包单位暂停分包单位施工,但总承包单位未予执行。总监理工程师随即向总承包单位下达了《工程暂停令》,总承包单位在向设备安装分包单位转发《工程暂停令》前,发生了设备安装质量事故。
问题:
针对事件1中总承包单位提出的设计变更要求,写出项目监理机构的处理程序。
2.根据《建设工程安全生产管理条例》规定,事件2中起重吊装专项方案需经哪些人签字后方可实施?
3.指出事件2中总监理工程师的做法是否妥当?说明理由。
4.事件3中总监理工程师是否可以口头要求暂停施工?为什么?
5.就事件3中所发生的质量事故,指出建设单位、监理单位、总承包单位和设备安装分包单位各自应承担的责任,说明理由。