Refer to the exhibit. There are two sites connected across WAN links. All intersite and intrasite links always have the same routing metric. The network administrator sees only the top routers and links being used by hosts at both LAN A and LAN B. What would be two suggestions to load-balance the traffic across both WAN links?()
A. Make HSRP track interfaces between the edge and core routers.
B. Replace HSRP with GLB用GLBP替换HSRP
C. Add crossed intrasite links: R1-R4, R2-R3, R5-R8, and R6-R7.
D. Make R3 and R8 have lower HSRP priority than R1 and R7.
E. Replace HSRP with VRRP
查看答案
关于白加白施工工艺,部分结合式加铺层最小厚度为()
A. 10cm
B. 12cm
C. 14cm
D. 16cm
下列哪些属于行政机关申请人民法院强制执行的法定条件()
A. 当事人在法定期限内不履行行 政决定
B. 当事人在法定期限内不申请行 政复议或者提起行政诉讼
C. 催告书送达十日后当事人仍未 履行义务
D. 行政机关没有行政强制执行权