题目内容

听力原文:Man: I went on a canoeing course last weekend, rather against my better judgement, because although I enjoy swimming, I thought canoeing might be too difficult. And I was right. I really couldn't get the hang of it. I bet the tutors will remember me: not because I was one of their star students, far from it, but I fell out of the canoe more often than everyone else put together! But even so, I enjoyed it so much that when some of the group signed up to do another course together, in six months' time, I found myself signing up too. I bet the tutors refuse to teach me next timer
You will hear five different people talking about short courses they have attended. For questions 19-23, choose from the list (A-F) what each speaker says about their course. Use the letters only once. There is one extra letter which you de net need to use.
A I was encouraged by the teachers to continue developing my skill.
B I learnt something about the subject that I hadn't expected.
C I preferred the social life to the course content.
D I intend doing a similar course again.
E I found out something about myself.
F I thought the course was good value for money.
Speaker 1

查看答案
更多问题

Jeremy Baker has been called out of a course to deal with a problem with the assembly line.

(五)固定资产
1.[账 套] [607]中国石化集团
[会计年度]2008
以用户名为02,密码为空,并于2008年1月1日登录607账套“固定资产”部分。
建账参数如下:固定资产启用时间为08年4月,以“工作量法”为主要折旧方法,折旧汇总分配周期为4个月;固定资产编码设置为2222,固定资产编码方式用手工输入法;固定资产对账科目为“1601固定资产”,折旧对账科目为“1602累计折旧”;与总账对账不平时不允许固定资产结账。
2. [账 套] [607]中国石化集团
[会计年度] 2008
以用户名为02,密码为空,并于2008年1月9日登录607账套“固定资产”部分。
将2008年1月9日新增的固定资产进行制单处理。
业务号:00006
借方科目:固定资产
贷方科目:实收资本
摘要:批量制单六一

A: Hello, Blue Sky Hotel. Can I help you?
B: Yes. Could you find out for me whether you have any vacancies tomorrow night?
A: Yes, we have some. What kind of rooms would you like to have?
B: Two single rooms, please. By the way, what facilities can you offer?
A: We have telephones, air conditioners, TV sets and washing machines in our rooms.

某高等级公路,全长47.6km,设计车速为130km/h,路面基层采用乳化沥青碎石基层进行施工,该工程的施工单位对基层的施工方法和出现的情况如下:
(1)拌合过程是在现场用人工拌制。
(2)用湿润的集料与阴离子乳化沥青拌合时,不能拌合均匀。
(3)施工人员在拌合混合料时的时间为90s。
(4)乳化沥青碎石混合料拌合均匀后,经过一段时间的破乳后,即进行摊铺。
(5)混合料摊铺后,采用轻型筒式压路机进行初压两遍后又用5t的轻型压路机进行复压两遍。
问题
1、拌合过程是否可采用人工拌制?最适宜的拌合方法是什么?
2、当湿润的集料与阴离子乳化沥青拌合不均匀时,应如何处理?
3、施工人员拌合混合料的时间是否符合规定?对拌合时间有何要求?
4、 混合料应该在什么时间摊铺?这体现的是混合料应具备的什么性质?
5、混合料的碾压方法是否正确?如不正确,应该如何碾压?
当湿润的集料与阴离子乳化沥青拌合不均匀时,应如何处理?
施工人员拌合混合料的时间是否符合规定?对拌合时间有何要求?
混合料应该在什么时间摊铺?这体现的是混合料应具备的什么性质?
混合料的碾压方法是否正确?如不正确,应该如何碾压?
请帮忙给出每个问题的正确答案和分析,谢谢!

答案查题题库