题目内容

mind as the instrument. The commonest way that has been used to find out the relative
intellectual level of creatures at different stage of evolutionary complexity has been to 【M2】______
study the way they behave when giving different kinds of puzzles. For example, an ant 【M3】______
possesses a complex routine of behaviour, but can it think? The answer is what if an ant is 【M4】______
forced to go through a maze of passages; many of which are dead ends, on its way to its
nestle, it starts by making a lot of mistakes and taking a great many wrong turnings. In the 【M5】______
end, however, after it has to worry its way through often enough, it does learn to get to its 【M6】______
nest without going into any of the blind alleys. As one moves up the evolutionary scale the
test of mind-power exemplified by solving the problem of getting through a maze be 【M7】______
comes very simple. Among mammals, for example, the maze is an inadequate test. The 【M8】______
learning problem does not tax enough attributes of the mind. In this sort of learning, as a
matter of fact, rats can hit university undergraduates and have, in fact, repeatedly done so. 【M9】______
The next, more subtle test of mental ability is to see what level an animal can think about 【M10】______
something when it is not there.
【M1】

查看答案
更多问题

已知y=ax3在X=l处的切线平行于直线y=2x-1,则a= 。

&8226;A meeting on sales promotion has been arranged on May 10th, 20--. It happens that the Sales Manager of the company must be away lot a marketing conference in another city around this time. Thus, the meeting has to be rescheduled. You, assistant to the Sales Manager, write a memo to the expected attendants.
Explain why the meeting is rescheduled.
Indicate the rescheduled time and place.
&8226;Write 40—50 words on your Answer Sheet.

某实施施工监理的工程,建设单位按照《建设工程施工合同(示范文本)》为甲施工单位签定了施工总承包合同。合同约定开工日期为2006年3月1日,工期为302天,建设单位负责施工现场外道路开通及设备采购;设备安装工程可以分包;甲施工单位通过筛选与乙施工单位签定安装分包合同。经总监理工程师批准的施工总进度计划如图4—1所示。 (时间单位:天)
在施工过程中发生了如下事件。
事件1:由于道路没有及时开通,使开工日期推迟到2006年3月4日,并造成施工方经济损失3万元,为此,施工单位于2006年3月10日向监理单位提出延长的索赔。
事件2:在基础工程施工中,由于遭遇特大暴雨,土:方工程发生滑坡,造成人员、机械损失共计5万元,导致C工作持续时间延长12天,为此提出经济补偿与工期的延期。
事件3:在主体施工过程中.甲施工单位为保证工程质量,改进了混凝土泵浇注的施工工艺,延误F工作时间10天,为此甲施工单位向建设单位提出延期10天的申请。
事件4:设备安装工程完工后进行验收,第一次试车验收结果不合格,经检查分析,是由于设备本身质量有问题造成的,为此乙施工单位提出将已安装的设备拆除,重新安装,并重新组织试车验收。为此造成J工作持续时间延长24天,费用增加6万元,甲施工单位就此提出工期的费用索赔。
[问题]
1.事件1中,管理单位应如何答复?说明理由。
2.事件2中,监理单位应采取什么措施?并对施工单位提出哪些要求?就施工单位提出的索赔,监理单位应如何答复?说明原因。
3.事件3中,甲施工单位改进施工工艺应遵循什么审批程序?对甲单位的延期申请,监理单位应如何答复?说明理由。
4.事件4中的验收应由谁来组织?监理单位对甲施工单位的索赔要求如理处理?说明理由。乙施工单位可得的补偿是什么?说明原因。

?Write a memo of 40-50 words to your secretary, telling him/her:
?When you are going on holiday and for how long
?What should happen to your mail
?What he/she should do in case of an emergency.
?Write on your Answer Sheet.

答案查题题库