题目内容

The officer in charge of the engineering watch shall notify the chief engineer without delay ().

A. in any emergency or if in any doubt as to what decision or measures to take
B. in the event of any impending action in machinery spaces that may cause reduction in ship’s speed
C. when isolating and bypassing machinery to be worked on
D. co-operating with any engineer in charge of maintenance work

查看答案
更多问题

学生因性别差异而产生的成绩差异的主要原因有()、()的影响和学校教育的不足。

发火冲能

在跑道端之外300米以内、跑道中心线两侧75米以内的区域进行的任何施工作业,在航空器起飞、着陆前()小时,施工单位应当完成清理施工现场的工作,包括填平、夯实沟坑,将施工人员、机具、车辆全部撤离施工区域。

股权投资差额的摊销期限一般不应低于()年。

A. 5
B. 10
C. 20
D. 40

答案查题题库