题目内容

What are the steps required to perform a Preservation install on a server?()

A. Shutdown the server and boot it into SMSelect SMS menu option OS Upgrade, Preservation install for the install type, and allow upgrade to run.
B. Shut down the server and perform a network boot from a local NIM server. Select Presevation install for the install type, and allow upgrade to run.
C. Shutdown the server and boot it into SMSelect SMS menu option OS Upgrade, Presevation install for the install type, and allow for upgrade to run.
D. Re-boot the server and NFS mount the bos images from a local NIM server. Run smit install. Select Presevation install for the install type, and allow upgrade to run.

查看答案
更多问题

细胞通过细胞周期中的限制点(R点,哺乳动物)时()。

A. DNA开始复制
B. RNA开始转录
C. 蛋白质开始合成
D. 细胞进入有丝分裂期(M期)

根据CCAR121部所要求的,卫生防疫包数量不得少于每100个旅客座位1个。

A. 正确
B. 错误

高速钢的工作温度可达()℃。

A. 300
B. 400
C. 500
D. 600

答案查题题库