题目内容

You are managing Oracle Database 11g with an ASM storage with high redundancy. The following command was issued to drop the disks from the dga disk group after five hours: ALTER DISKGROUP dga OFFLINE DISKS IN FAILGROUP f2 DROP AFTER 5H; Which statement is true in this scenario?()

A. It starts the ASM fast mirror resync.
B. All the disks in the dga disk group would be OFFLINE and the DISK_REPAIR_TIME disk attribute would be set to 5 hours.
C. It drops all disk paths from the dga disk group.
D. All the disks in the dga disk group in failure group f2 would be OFFLINE and the DISK_REPAIR_TIME disk attribute would be set to 5 hours.

查看答案
更多问题

确定项目目标,首先应依据施工组织设计的项目质量总目标和工程项目的组成与划分,逐级分解,落实责任部门和个人。

A. 正确
B. 错误

美国的市政府是由联邦议会批准设立的。

A. 正确
B. 错误

工作票签发人应对下列哪些事项负责()

A. 工作是否必要和可能
B. 正确地和安全的组织工作
C. 对工作负责人正确说明哪些设备有压力,高温和有爆炸危险等
D. 对工作人员给予必要指导

浇筑式沥青混凝土早期强度增涨较快,施工完成后即可开发交通

A. 正确
B. 错误

答案查题题库