题目内容

Traditional Internet access methods like dial-up were so slow that host computers were connected to the dial-up(71)at the customer premise over slow(72)ports. PPP was designed to run directly over these serial links. But with the advent of broadband Internet(73)technologies such as ADSL and cable modems there has been a considerable increase in the bandwidth delivered to the end users. This means that the host computers at the customer premise connect to the(74)or cable "modem" over a much faster medium such as Ethernet. It also means that multiple(75)can connect to the Internet through the same connection.,

A. buffer
B. modem
C. computer
D. server

查看答案
更多问题

在过程式程序设计(①)、数据抽象程序设计(②)、面向对象程序设计(③)、泛型(通用)程序设计(④)中,C抖语言支持(15),C语言支持(16)。

A. ①
B. ②③
C. ③④
D. ①②③④

软件测试的目的是(59),通常可分为白盒测试和黑盒测试。白盒测试根据程序的(60)来设计测试用例,黑盒测试根据软件规格说明来设计测试用例。

A. 尽可能多地发现程序中的错误
B. 改正程序中的所有错误
C. 证明程序是正确的
D. 证明程序完成了应完成的功能

在进行金融业务系统的网络设计时,应该优先考虑优胜(69)原则。在进行企业网络的需求分析时,应该首先进行(70)。

A. 先进性
B. 开放性
C. 经济性
D. 高可用性

软件能力成熟度模型CMM(Capability Maturity Model)描述和分析了软件过程能力的发展和改进程度,确立了一个软件过程成熟程度的分级标准。该模型的第2级为可重复级,它包含了(62)关键过程域。

A. 软件配置管理、软件质量保证、软件项目跟踪与监控、软件项目计划和需求管理
B. 软刊:配置管理、软件质量保证、软件子合同管理、软件项目计划和需求管理
C. 软件配置管理、软件质量保证、过程量化管理、软件项目跟踪与监控、软件项目计划和需求管理
D. 软件配置管理、软件质量保证、软件子合同管理、软件项目跟踪与监控、软件项目计划和需求管理

答案查题题库