下列谜语都与书中哪个人物有关?请选择谜底正确的一组。()更上一层楼碰杯慢慢摇
A. 高览、蒋干、周仓
B. 高览、蒋干、徐晃
C. 雷同、蒋干、徐晃
The network administrator is adding a new N1Kv to the vCenter, however, the administrator does not see the new switch under the networking tab of vCenter. The administrator issues the following command on the VSM to troubleshoot: VSM# show svs connections connection VC: ip address: 10.10.10.30 remote port: 80 protocol: vmware-vim https certificatE. default datacenter namE. DC1 DVS uuiD. 67 32 30 50 a6 d2 49 64-9e 1c 5f 49 e3 af 55 99 config status: Disabled operational status: Disconnected sync status: - version: - When attempting to fix the issue, the following error is seen: VSM-PRI-188# conf VSM-PRI-188(config)# svs connection VC VSM-PRI-188(config-svs-conn)# connect ERROR: [VMWARE-VIM] Extension key was not registered before its use What is the cause of the error?()
A. Missing control VLAN in VSM configuration
B. Missing packet VLAN in VSM configuration
C. VSM has no network connection to vCenter
D. VSM extension key is not installed on vCenter
E. vCenter extension key is not installed on VSM
有“曲状元”之称的元代作家是()
A. 郑光祖
B. 王实甫
C. 马致远
D. 张养浩
某输变电工程公司在浙江省经竞标,获得了一500kV的变电站建设项目和20km输电线路的架设项目,设备由浙江省电力公司经国网公司集中采购。在施工过程中发生了一系列问题:其一,在组立铁塔时,因设置缆风绳和铁塔组片,损坏了村民的庄稼和果树,与村民就赔偿问题发生矛盾;其二,在架空线路通道上,因架空电力线路要跨越村民房屋,与村民发生了冲突,后通过协商原则,采取必要的防护措施妥善解决;其三,在输电线路施工中因施工场地及占用道路与当地农民和交通管理部门发生了冲突;其四,项目部在变电施工过程中经常与监理工程师发生分歧和摩擦,变压器安装因交货期滞后及质量问题与供货商和业主发生矛盾,交工验收时又与当地电力部门因设备技术资料不全发生分歧,整个工程施工过程矛盾不断,工期延误,给企业的经济效益和社会信誉都造成了一定影响。 电力法中,架空电力线路跨越村民房屋有什么规定?如何采取必要的防护措施?