Michael is discussing an inspection scheme with Monica, the Quality inspection manager. Listen to the conversation and choose the best answer to each question.Which inspection will be conducted first?
A. First Piece Inspection
B. Receiving Inspection
C. Batch Inspection
D. Sampling Inspection
查看答案
According to Monica, which inspection is of great importance?
A. First Piece Inspection
B. Receiving Inpsection
C. Final Inspection
D. Sampling Inspection
How often will they carry out the sampling inspections?
A. Twice a week
B. At set intervals
C. At random
D. Every day
When is the Final Inspection usually carried out?
A. Before the lathes are ready fro packaging.
B. After the lathe are transported to the customers.
C. Before the lathes are installed are installed for a testing.
D. When the material and the parts from the suppliers arrive.
What does Monica remind Michael to do at last?
A. To send her the inspection scheme.
B. To check the misssing parts of the lathes
C. To study the designing specifications.
D. To keep records of the inspections.