题目内容

As the DBA, you run the following query on your ASM instance. What is the implication of the results of the query?() SQL> select group_number, name, state from v$ASM_DISKGROUP; GROUP_NUMBER NAME STATE 0 DGROUP1 DISMOUNTED 2 DGROUP2 MOUNTED 3 DGROUP3 MOUNTED

A. The DGROUP1 disk group was unmounted by another DB
B. A datafile has been lost, causing the ASM disk group DGROUP1 to go into the DISMOUNTED state
C. One of the redundant disks (DGROUP1) has been lost in a disk group.
D. This query has no meaning in an ASM instance.
E. A disk associated with a disk group was discovered after the ASM instance initially opened.

查看答案
更多问题

某研究者进行了一项关于脂肪摄入与男性前列腺癌关系的队列研究,选择高脂肪和低脂肪摄入者各100名,从65岁对他们随访10年。在随访期间,高脂肪摄入组中有10人、低脂肪摄入组中有5人被诊断患有前列腺癌。请问患前列腺癌的危险比(高脂摄入组比低脂摄入组)是()。

A. 2.0
B. 0.75
C. 1.0
D. 1.5
E. 0.5

临时用电的准用程序包括: ①协助业主向当地电业部门申报用电方案; ②经电业部门检查、验收和试验,同意送电后送电开通; ③对施工项目进行检查、验收,向电业部门提供相关资料,申请送电; ④进行临时用电设备、材料的采购和施工。 其正确的准用程序是()。

A. ①③④②
B. ④③①②
C. ①④③②
D. ④③①②

根据《放射性同位素与射线装置安全许可管理办法》(环境保护部第三号令)第十六条规定,使用放射性同位素和射线装置开展诊断和治疗的单位,还应当配备(),制定相应的质量保证大纲和质量控制检测计划,至少有1名医用物理人员负责质量保证与质量控制检测工作。

A. 放射性检测设备
B. 报警设备
C. 保护设备
D. 质量控制检测设备

技术质量资料:施工调查报告及资料。施工组织设计,重点工程施工方案、计划、申请开工报告及批准开工文件()。

A. 技术交底资料、施工测量资料
B. 工程创优规划及创优原始资料
C. 各种工程检查证、合格证、试验报告单,材料合格证,检查试验资料
D. 各种施工记录、工程日志;工程施工技术总结
E. 竣工验收报告,竣工验收记录,竣工文件、资料及其他技术资料

答案查题题库