题目内容

A.He turned suddenly and ran into a tree.B.He was hit by a fallen box from a truck.C.H

A. He turned suddenly and ran into a tree.
B. He was hit by a fallen box from a truck.
C. He drove too fast and crashed into a truck.
D. He was trying to overtake the truck ahead of him.

查看答案
更多问题

A.needsB.notionsC.motionD.blows

A. needs
B. notions
C. motion
D. blows

某建设项目各年的现金流人量和流出量如下表所示.则该项目的动态投资回收期为 ()年。

A. 5.63
B. 6.63
C. 7.63
D. 8.63

已知某建设项目社会折现率为6%时,项目的经济净效益为12万元,社会折现率为 7%时,经济净效益为-8万元,则该项目的经济内部收益率为()。

A. 0.066
B. 0.065
C. 0.064
D. 0.063

某建设项目开始运营后,在某一生产年份的资产总额为5000万元,短期借款为450万元,长期借款为2000万元,应收账款120万元,存货为500万元,现金为1000万元,应付账款为150万元,项目单位产品可变成本为50万元,达产期的产量为20吨,年总固定成本为 800万元,销售收入为2500万元,销售税金率为6%,则其速动比率为()。

A. 2.7
B. 1.87
C. 1.52
D. 1.46