【背景材料】
某承包商参与某高层商用办公楼土建工程的投标(安装工程由业主另行招标)。为了既不影响中标,又能在中标后取得较好的收益,决定采用不平衡报价法对原估价作了适当调整,具体数字如表1-4所示。
现假设桩基围护工程、主体结构工程、装饰工程的工期分别为4个月、12个月、8个月,贷款月利率为1%,并假设各分部工程每月完成的工作量相同且能按月度及时收到工程款(不考虑工程款结算所需要的时间)。
【问题】
1. 该承包商所运用的不平衡报价法是否恰当?为什么?
2.采用不平衡报价法后,该承包商所得工程款的现值比原估价增加多少(以开工日期为折现点)?
查看答案
Doves flying in daylight use the sun for guidance. But the stars are obviously their most
听力原文: My wife and I spent two weeks in London last year. We went there in the autumn. We think it is the best season to visit England. The weather is usually good and there aren't too many tourists in October. We stayed in a small hotel in the West End. It was convenient as we did most of our sightseeing on foot. Taxis were too expensive, we couldn't understand the bus routes, and my wife didn't like traveling on the underground. She said it made her feel sick.
In fact, we enjoyed our holiday so much that we have already planned again for this year. We're going to take our umbrellas, though, I'm sure we'll need them sometimes.
My wife and I spent two weeks in London last year. We went there in the【11】We think it is the best season to visit England. The weather is usually good and there aren't too many【12】in October. We stayed in a small hotel in the West End. It was convenient as we did most of our【13】on foot. Taxis were too【14】, we couldn't understand the bus routes, and my wife didn't like traveling on the underground. She said it made her feel sick.
In fact, we enjoyed our holiday so much that we have already【15】again for this year. We're going to take our umbrellas, though, I'm sure we'll need them sometimes.
劳动争议也称劳动纠纷,是指劳动关系双方当事人之间因劳动责任的认定与实现所产生的纠纷。劳动争议实质上是劳动关系当事人之间利益矛盾、利益冲突的表现。与其他社会关系纠纷相比,劳动争议具有以下特征:劳动争议的当事人是法定的,是劳动合同的当事人;劳动争议的形式是特定的,凡是以劳动权利义务以外的权利义务为标的的争议都不属于劳动争议;劳动争议具有特定的影响范围,一般的社会关系纠纷的影响范围通常局限在争议主体之内,而重大的集体劳动争议、团体劳动争议涉及面广,影响范围大,有的甚至造成国际影响。
请指出上述描述中存在的5处错误,并加以改正。
假设(DS)=2000H,(BX)=1256H,(SI)=528FH;位移量TABLE=20A1H,(232F7H)=3280H,(264E5H)=2450H,则执行JMP BX后,(IP)=【 】;执行指令JMP TABLE[BX]后,(IP)=3280H;