题目内容

小徐2009年12月3日与某IT公司签订了5年固定期限劳动合同,约定工资5000元/月,2012年3月4日期以小徐“考核不合格,经培训和调岗后,仍不合格”为由依法与其解除劳动合同。小徐在劳动合同解除前12个月平均工资为6000元,当地上年度职工月平均工资为3000元。请问,该IT公司应支付给小徐()经济补偿?

A. 12500元
B. 7500元
C. 15000元
D. 12000元

查看答案
更多问题

Ravi, like many project (1) , had studied the waterfall model of software development as the primary software life-cycle (2) . He has all set to use it for an upcoming project, his first assignment. However, Ravi found that the waterfall model could not be used because the customer wanted the software delivered in stages, something that implied that the system had to be delivered and built in (3) and not as (4) . The situation in many other projects is not very different. The real world rarely presents a problem in which a standard process, or the process used in a previous project, is the best choice. To be the most situation, an existing process must be (5) to the new problem. A development process, even after tailoring, generally cannot handle change requests. To accommodate change requests without losing control of the project, you must supplement the development process with a requirement change management process.空白(5)处应选择()

A. modified
B. used
C. suited
D. tailored

医院感染可能发生的部位有()

A. 10个
B. 20个
C. 30个
D. 40个
E. 50个

舒尔茨人力资本理论

试述肛瘘的临床分类。

答案查题题库