题目内容

Ravi, like many project (1) , had studied the waterfall model of software development as the primary software life-cycle (2) . He has all set to use it for an upcoming project, his first assignment. However, Ravi found that the waterfall model could not be used because the customer wanted the software delivered in stages, something that implied that the system had to be delivered and built in (3) and not as (4) . The situation in many other projects is not very different. The real world rarely presents a problem in which a standard process, or the process used in a previous project, is the best choice. To be the most situation, an existing process must be (5) to the new problem. A development process, even after tailoring, generally cannot handle change requests. To accommodate change requests without losing control of the project, you must supplement the development process with a requirement change management process.空白(5)处应选择()

A. modified
B. used
C. suited
D. tailored

查看答案
更多问题

医院感染可能发生的部位有()

A. 10个
B. 20个
C. 30个
D. 40个
E. 50个

舒尔茨人力资本理论

试述肛瘘的临床分类。

当数据库由于各种原因而使其完整性遭到破坏时,必须采取以下哪项措施来恢复数据库?()

A. 重新安装数据库
B. 换一种数据库
C. 使用数据库备份
D. 将数据库中的数据利用工具导出,并保存

答案查题题库