The government has just passed a new regulation, which means that an environmental project you do for a public sector must add an additional procedure before the scope is officially approved. What kind of dependency is the example?政府刚通过了一项新的规定,这意味着你为一个公共部门做的一个环境项目必须在范围正式认可之前增加一个额外的程序。这是一个______依赖关系的例子。
A. Mandatory 强制性
B. Regulatory 调整性
C. Selective 选择性
D. External外部
查看答案
In the context of a project, "scope" may mean; 在项目的环境中,“范围”可以指()。
A. Production scope and work scope产品范围和工作范围
B. Production scope and project scope 产品范围和项目范围
C. Project scope and management scope项目范围和管理范围
D. Project scope and requirement scope 项目范围和需求范围
Scope creeping is: 范围蔓延是指()。
A. Reasonable extension of project scope项目范围的合理延伸
B. Reaonable extension of product scope 产品范围的合理延伸
C. Approved project scope or product scope change 经过批准的项目范围或产品范围变更
D. Uncontrolled change of project scope or product scope未得到控制的项目范围或产品范围变更
The U.S. Bureau of Indian Affairs awarded your firm a contact to renovate an elementary school on a Navajo reservation. One contractual term, Indian preference, requires you to hire Native American laborers and subcontractors from the reservation. This is an example of which type of the following constraints?美国印第安人事务局将在Navajo 保留地翻修一所小学的项目外包给了你的公司。一个合同小组要求你雇佣当地的美国劳工和保留地的承包商。这是以下哪种限制条件:
A. Social社会的
B. Economical经济的
C. Environmental环境的
D. Legal法律的
During the Create WBS process, the work breakdown structure should be developed to:在项目制定工作分解结构过程中,工作分解结构应当被制定为:
A. The sub-project level. 子项目级别
B. The level determined by the project office. 由项目办公室决定的级别
C. A level at which the cost and schedule for the work can be reliably estimated. 允许可靠地估算成本与进度的级别
D. The cost center level. 成本中心级别