题目内容

应随时检查冲管上、下密封盘根盒处是否刺漏钻井液,上、下机油盘根处是否溢漏机油,水龙头壳体是否温度过高。油温不得超过()℃。

查看答案
更多问题

某建设工程公司承接某市供热厂工程的施工任务,该项目由油化库、空压站、汽车库、机修车间、锅炉间、烟囱、等多个工业建筑和办公楼等配套设施,该项目规模大,工期紧迫,因此经业主同意后,将办公楼等配套设施分包给一家民营建筑公司。为了如期完工,施工单位经过认真分析,编制了周密的施工进度计划。施工进度计划包括几个层次?分别是什么?

You plan to install Windows 7 on a computer that contains a single hard disk drive. The hard disk drive isconnected to a RAID controller. During the installation, you discover that the Windows 7 installation mediadoes not include the files required to install the RAID controller. You need ensure that you can installWindows 7 on the hard disk drive. What should you do?()

A. Insert the Windows installation media and press F8 during the computer s power-on self test (POST).
B. Insert the Windows installation media and press F6 during the computer s power-on self test (POST).
C. Start the computer from the Windows installation media. From the Install Windows dialog box, click Load Driver.
D. Start the computer from the Windows installation media. From the Install Windows dialog box, click Drive options (advanced).

什么是稳定传热?

病房管理实行()

A. 科主任责任制
B. 科护士长责任制
C. 区长责任制
D. 主管责任制
E. 护士长责任制

答案查题题库