题目内容

A primary objective of testing is to assure that the system meets the full requirements, including quality requirements (functional and non-functional requirements) and fit metrics for each quality requirement.

查看答案
更多问题

It is preferred that there will be at least one (1) full time tester assigned to the project for the system/integration and acceptance testing phases of the project.

All test hardware platforms must have been successfully installed, configured, and functioning properly.

Black-box testing, sometimes called behavioral testing or partition testing, enables one to derive sets of input conditions that that will fully exercise all functional requirements for a program.

不同宽度或厚度钢板采用对接连接时应采取何项措施?【】

A. 对较窄板件进行放坡处理。
B. 对较宽板件进行放坡处理。
C. 对较薄板件进行放坡处理。
D. 对较厚板件进行放坡处理。

答案查题题库