A project has several teams. Team A has repeatedly missed several deadlines in the past. This has caused Team B to have to crash the critical path several times. As the project leader for Team B,you should_____一个项目由几个团队组成,小组A 在过去曾多次在最后期限前没有完成任务,这导致小组B好几次不得不对关键路径赶工。作为B组项目领导, 你应该______
A. Meet project manager alone 单独会见项目经理
B. Meet leader of team A会见小组A的领导
C. Meet sponsor 会见发起人
D. Meet project manager and leader of Team A 会见项目经理和小组A的领导
A project team was composed of 6 members. Six (6) more members additionally joined to this team. What is the increase in communication channel? 项目团队原来有6个成员。现在新增加6个成员。沟通渠道增加到了多少?
A. Six (6)6条
B. 4.4 times 4.4倍
C. 2 times 2倍
D. Twenty ,20条
Filtering is a concept that occurs when:过滤这个概念在什么时候出现?
A technique used in conjunction with a project communication plan一个技术结合项目沟通计划使用时
B. The supervisor performs verification and documentation of the results of a communications message监督人执行沟通信息审核和文档记载时
C. A large portion of the message was lost in upward or downward communications between a subordinate and supervisor 在上下级之间的沟通中大部分信息丢失
D. A and B,A和B
In the project team, communicate在项目团队中,沟通()。
A. The more, the better越多越好
B. Only for information that is conducive to the success of the project 只能针对那些有利于项目成功的信息
C. It should be done among all project team members应该在所有的项目团队成员之间进行
D. All information should be sent to all team members应该把所有信息发送给所有团队成员