屋面防水施工,防水层及附加层伸入水落口杯内不应小于(),并应粘结牢固。
查看答案
Refer to the exhibit. There are two sites connected across WAN links. All intersite and intrasite links always have the same routing metric. The network administrator sees only the top routers and links being used by hosts at both LAN A and LAN B. What would be two suggestions to load-balance the traffic across both WAN links?()
A. Make HSRP track interfaces between the edge and core routers.
B. Replace HSRP with GLB用GLBP替换HSRP
C. Add crossed intrasite links: R1-R4, R2-R3, R5-R8, and R6-R7.
D. Make R3 and R8 have lower HSRP priority than R1 and R7.
E. Replace HSRP with VRRP
关于白加白施工工艺,部分结合式加铺层最小厚度为()
A. 10cm
B. 12cm
C. 14cm
D. 16cm