某系统中有四种互斥资源R1、R2、R3和R4,可用资源数分别为3、5、6和8。假设在T0时刻有P1、P2、P3和P4四个进程,并且这些进程对资源的最大需求量和已分配资源数如下表所示,那么在T0时刻系统中R1、R2、R3和R4的剩余资源数分别为(21)如果从T0时刻开始进程按(22)顺序逐个凋度执行,那么系统状态是安全的。
A. 3、5、6和8
B. 3、4、2和2
C. 0、1、2和1
D. 0、1、0和1
查看答案
Traditional Internet access methods like dial-up were so slow that host computers were connected to the dial-up(71)at the customer premise over slow(72)ports. PPP was designed to run directly over these serial links. But with the advent of broadband Internet(73)technologies such as ADSL and cable modems there has been a considerable increase in the bandwidth delivered to the end users. This means that the host computers at the customer premise connect to the(74)or cable "modem" over a much faster medium such as Ethernet. It also means that multiple(75)can connect to the Internet through the same connection.,
A. buffer
B. modem
C. computer
D. server
在过程式程序设计(①)、数据抽象程序设计(②)、面向对象程序设计(③)、泛型(通用)程序设计(④)中,C抖语言支持(15),C语言支持(16)。
A. ①
B. ②③
C. ③④
D. ①②③④
软件测试的目的是(59),通常可分为白盒测试和黑盒测试。白盒测试根据程序的(60)来设计测试用例,黑盒测试根据软件规格说明来设计测试用例。
A. 尽可能多地发现程序中的错误
B. 改正程序中的所有错误
C. 证明程序是正确的
D. 证明程序完成了应完成的功能
在进行金融业务系统的网络设计时,应该优先考虑优胜(69)原则。在进行企业网络的需求分析时,应该首先进行(70)。
A. 先进性
B. 开放性
C. 经济性
D. 高可用性