A Ezonexam Ethernet switch receives a unicast frame. with a destination MAC that is listed
A. The switch will forward the frame. to a specific port
B. The switch will forward the frame. to all ports except the port on which it was received
C. The switch will return a copy of the frame. out the source port
D. The switch will not forward unicast frames
E. The switch will remove the destination MAC from the switch table
F. None of the above.
查看答案
?Your company bas received a lot of complaints about its telephone service. You looked into the problem and made the following notes:
?Phone left to ring too long before being answered.
?Calls answered impolitely, e.g. just "Hello".
?Transferring calls automatically to a colleague — often the colleague doesn't know about the transfer, or how long it will be for.
?Taking messages — some employees not writing detailed messages down (date, time, caller's name and number),
?The Office Manager has asked you to write a report to all staff on recommended telephone procedures.
?Write the report in about 120 - 140 words, explaining how stall' should use the phones. Use the information in your notes above.
?Write on your Answer Sheet.
A truck driver wants to load as many identical cylindrical canisters of olive oil as can fit into the 3- meter ×4- meter ×9- meter storage space of his truck. How many canisters can he load into the truck?
(1) Each canister has a volume of 62,500π cubic centimeters.
(2) The height of each canister is four times the radius.
某业主与W工程公司依据FIDIC条款格式,订立了某机电安装工程的施工合同。合同规定:采用单价合同,因设计变更而发生的工程量变化,按实调整;同时视具体的变动情况.业主与承包商商谈变更后的单价。合同工期为18天,工期每提前1天奖励2000元,每拖后1天罚款4000元。W工程在开工以前及时提交了施工网络进度计划(如图1所示),并得到业主的批准。
工程施工过程中发生如下事件:
事件一:因工程师提供的数据有误,导致在基坑土方开挖时,将地下电缆挖断,造成施工现场停电;使工作B和工作C的工效降低,作业时间分别拖延1天和2天,多用人工18个工日和11个工日(假设人工工日单价为25元/工日,应由甲方补偿的人工窝工和降效费为12元/工日);B工作自有施工机械每天折旧费为615元,C工作自有施工机械每天折1日费为310元。
事件二:K工作中,原施工组织设计采用50吨轮胎式起重机(自有机械,设备折旧费为796元/天),但开工前该设备恰好出现故障需要大修,且考虑到现场的实际情况,W公司外租一台120吨履带式起重机,租赁费为1000元/天,工期缩短1天。
事件三;因施工中意外发现一条地下管线,且在业主提供的施工图纸中没有标明。经业主同意,工作H的工程量增加20m3,该工作维持综合单价为95元/m3不变;工作G原有工程量为200m3,现工程量减少20m3,单价由78元/m3,调整为88元/m3。相应的工期没有变化。
事件四:I、J工作为钢筋混凝土项目,因在冬季施工,按照有关规范的规定,在混凝土浇注的过程中,采取了冬季施工措施,使这两项工作的作业时间均延长了2天,使用防冻剂等措施费分别为2000元、850元。
其余各项工作的实际作业时间和费用均与原计划相符。
上述哪些事件承包商可以提出工期和费用补偿要求?哪些事件承包商不可以提出工期和费用补偿要求?简述其理由。